Read the surrounding source text. Open either crop at full size to zoom in on small text.
Before · Original bid setM0.0

Remark 6 includes the full requirement for operation without spray water. The FC-1 schedule tag is shown below the remarks.
Open full-size source crop: Before, Original bid set, M0.0 (opens in a new tab)After · Addendum 2M0.0

The same remark 6 now specifies LWT 93.13°F for operation without spray water. Other source revision clouds are also visible in this wider context.
Open full-size source crop: After, Addendum 2, M0.0 (opens in a new tab)
